So my actinics modification from Nano-tuners arrived on Sat.
Everything was excellently packed.
I downloaded the detailed PDF, and watched the (3) youtube installation guides.
Then I went out and bought a soldering iron, rivet gun, and heat shrink wrap, (recommended but not required).
So what takes the guy approx 30mins on the video, took me 2 hours, which is understandable, I wasn't rushing or as prepared as the guy on the video.
Overall I found it very easy to make the mods, and everything you needed was in the pack, my soldering, and rivets, were belt and braces rather than required.
So its only be running for a 2 days, the Zoos colours are slightly more bright, so are the millis and acros. I've not noticed a dramatic increase in the water temp (I'm not running a chiller), but I'll keep an eye on it, it used to peak around 79.8F before.
Everything was excellently packed.
I downloaded the detailed PDF, and watched the (3) youtube installation guides.
Then I went out and bought a soldering iron, rivet gun, and heat shrink wrap, (recommended but not required).
So what takes the guy approx 30mins on the video, took me 2 hours, which is understandable, I wasn't rushing or as prepared as the guy on the video.
Overall I found it very easy to make the mods, and everything you needed was in the pack, my soldering, and rivets, were belt and braces rather than required.
So its only be running for a 2 days, the Zoos colours are slightly more bright, so are the millis and acros. I've not noticed a dramatic increase in the water temp (I'm not running a chiller), but I'll keep an eye on it, it used to peak around 79.8F before.