200DD Leveling

SNTLewis

Member
My 200dd on my new 1.5" steel frame on my new tile floor is about 0.25" out of level left/right.

Can I SAFELY shim under the steel stand? What other methodology should I be considering?

Stan
 
Make a dam out of plywood strips held to the floor with two-sided tape to cover the area of the stand. Fill with levelling compound.

Dave.M
 
Back
Top