peterlin98
Premium Member
I just added a DC4 heavy duty to AC Jr already configured with DC8.
DC8 is configured as A01-A08
DC4 is configured as A09-A12
The display will not show the add'l 4 outputs.
I have renamed LT1 (Light1 that was on A01) to LT1 A09. My intention is to move all MH to DC4 heavy duty. I can manually control the lights on DC4. I repeated the steps of renamed the following
LT2 on A02 to LT2 on A10
LT3 on A03 to LT2 on A11
The result? I'm still seeing 8 devices. What gives? The output cable from DC8 is connected to input of DC4. I power off and on the AC Jr and cannot find where to display the add'l devices.
Also - I would like to see A01 to A08 followed by A09 to A12. I am wondering about the order of display - or is the display devices are in the sequence of how the devices are added. If so - it would be very inconvenient to delete all and add all devices back.
Thanks in advance.
DC8 is configured as A01-A08
DC4 is configured as A09-A12
The display will not show the add'l 4 outputs.
I have renamed LT1 (Light1 that was on A01) to LT1 A09. My intention is to move all MH to DC4 heavy duty. I can manually control the lights on DC4. I repeated the steps of renamed the following
LT2 on A02 to LT2 on A10
LT3 on A03 to LT2 on A11
The result? I'm still seeing 8 devices. What gives? The output cable from DC8 is connected to input of DC4. I power off and on the AC Jr and cannot find where to display the add'l devices.
Also - I would like to see A01 to A08 followed by A09 to A12. I am wondering about the order of display - or is the display devices are in the sequence of how the devices are added. If so - it would be very inconvenient to delete all and add all devices back.
Thanks in advance.