I'm setting up a 180 gal (reef) side by side a 60 gal (refugeium). I'm putting a deep sand bed in the 60 and I want to gravity feed it to the 180. I would like to do this without having to raise the 60 higher than the 180. I'm thinking if I have a hole drilled high on the back of the 60 and a hole drilled low on the 180 this might just work.
Do any of you have any additional insight into this problem? Who do you recommend for drilling holes for bulkheads here in Springfield?
Thanks,
Chad
Do any of you have any additional insight into this problem? Who do you recommend for drilling holes for bulkheads here in Springfield?
Thanks,
Chad