New 90/g plumbing progress pic.

Reefahholic

New member
Got it dry plumbed, but still need to make a few minor adjustments before I glue.

Need to even up the white union on the emergency pipe to be more uniform with drain ball valves, and see if I like having two 90's on my drains. It's gonna clogg easier and increase drain time, but the filter socks will be easier to change out. So not real sure how I want to do it.

Both ways have pros and cons. The first time, I piped it all in like the emergency and didn't really like it. It drained well though.

1fe6c1e8.jpg
 
ohh forgot to say that i did end up taking the advice from you guys and went with 1.5" bulkheads instead of 1".

also, drilled all my holes on the same center line this time. I just cut 1/4" off one of the down turned elbows to force my main drain into siphon first.

I think im going to do a 1" return instead of the 3/4" like last time. thanks for the help boyzz...:beer::beer:
 
Back
Top