I am dipping my toes into the waters of advanced programming with my Apex. I want to eliminate the Tunze 7096 controller by programming the Apex unit to vary the speed and alternate on/off with my 6105s. I have two of them. My question is what outlets on the EB8 do I plug each 6105 into? Other than plugging them into one of the six solid state outlets, are there any other particulars as to the location on the energy bar to take advantage of this programming feature?