I was sitting here and figured I would get my overflow pipes and returns put into place The pipes came used so most of the stuff is prefited only thing is on the bulkheads the stand pipe and return pipe inside the overflow must have a screw in connnection vs the straight pipe going into the bulkhead right? dumb question I know but hope I made sense