I too have a very extensive RKE system. I would not want any other controller. The system is rock solid and getting better every day. You can connect up to 63 modules to a single head unit, meaning PC4 outlet strips, SL1's (ph, temp, ORP, contacts), Moonlight controller, etc. I think it would be very easy to set it up to control two or more tanks.