Hi guys
Those of you with a basement sump- how did you finish the "˜through-floor' part of the plumbing run?
Was hoping fir something more elegant than cutting a rectangle big enough for 4 x 1.25 inch pvc pipes and unions, and filling the gaps with foam.
Anyone use bulkheads, or other fancier methods?
Thanks!
Sent from my iPhone using Tapatalk
Those of you with a basement sump- how did you finish the "˜through-floor' part of the plumbing run?
Was hoping fir something more elegant than cutting a rectangle big enough for 4 x 1.25 inch pvc pipes and unions, and filling the gaps with foam.
Anyone use bulkheads, or other fancier methods?
Thanks!
Sent from my iPhone using Tapatalk