kirtdog
Member
Hi all,
I set up my 75 in the basement and have found that it is way out of level. It appears that the floor is graded to direct water to a floor drain. I tried to put shims under it but it is almost up about 1/4". I think that is way too much. Anyone have any suggestions on what I can do?
I guess I could move it upstairs if needed but I chose to put it in the basement due to the weight and the locations where it would fit upstairs go parallel with the joists and I am not sure that it would be sitting on two of them.
here is a pic of the levels. it doesn't look like much but when filled with water, the water level is about an inch higher on the left side.
I set up my 75 in the basement and have found that it is way out of level. It appears that the floor is graded to direct water to a floor drain. I tried to put shims under it but it is almost up about 1/4". I think that is way too much. Anyone have any suggestions on what I can do?
I guess I could move it upstairs if needed but I chose to put it in the basement due to the weight and the locations where it would fit upstairs go parallel with the joists and I am not sure that it would be sitting on two of them.
here is a pic of the levels. it doesn't look like much but when filled with water, the water level is about an inch higher on the left side.

Last edited: