This may be a long shot, but is someone a structural engineer here on MARS? Or does someone work with/know one? I have a question about placing a 150g tank on a second story i need some help with.
I did a lot of reading and bottom line wouldn't recommend it unless it is in some sort of commercial setting.
Most 150's are only four feet long so even near a load bear wall spaced over three floor joists it is a lot of weight for a normal house or apt.
If it is in some sort of concrete constructed building or directly over a load bearing wall. Or you build a stand to more evenly distribute the weight not as big of a deal.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.