A.VOID
Premium Member
On my current tank, I used Flexible PVC on the overflow and clear hosing on the return.
New tank with built in overflow, and I'm going to plumb it with PVC for a little cleaner look....
I'm thinking I should just use the PVC above the sump, and then use hosing to connect into the PVC coming up out of the sump. This way it's clean and easy to move stuff around in the sump and get access to the return pump. OR if I use hard PVC all the way to the pump then how do I do maintenance?
Bulkheads are 1", but the overflow pipe is 1.5" >>> 1" bulkhead. Do I go ahead and keep 1" after the bulkhead or increase it back to 1.5"?
New tank with built in overflow, and I'm going to plumb it with PVC for a little cleaner look....
I'm thinking I should just use the PVC above the sump, and then use hosing to connect into the PVC coming up out of the sump. This way it's clean and easy to move stuff around in the sump and get access to the return pump. OR if I use hard PVC all the way to the pump then how do I do maintenance?
Bulkheads are 1", but the overflow pipe is 1.5" >>> 1" bulkhead. Do I go ahead and keep 1" after the bulkhead or increase it back to 1.5"?