550ish build thread

TChristman

Premium Member
After making the progession from a 37 to a 150 to a 210 I am finally doing my dream build. The tank will be 96 x 36 x 29. A little over 400 gallons with a 72 x 24 x 17 sump and my current 24 x 24 frag tank plumbed into the same system.

I wanted to go with a very large sump to be able to have ample room for a large fuge and a larger skimmer area. The 24" width was important to me as well as I am not a fan of working in tight spaces.

The wife and I decided to finish the basement so I wanted to have a fish room that could easily be converted to a bedroom if we sell the house. The fish room will be 13 x 13 so I will have ample room to build a larger frag system in the near future.

I will have plenty of equipment that I plan to use for the frag system or sell upon completion.

Other rooms in the finished area will be two storage areas, bathroom, family room, play room, fitness room and a sauna. The wife had to get something out of this.

I will update as progress is made but I like picture intense builds so I wanted to include pictures from start to finish.


The build will also include some of the areas of improvements of the basement. We are trying to make it an extension of the house and not have too much of a basement feel.

The first picture is obviously the framing for the tank. The second is of the area behind the tank (fish room) and the third is the removal of a wall to have a staircase built instead of a tunnel to the basement. The fourth picture is the framing for the fireplace and recessed area for the television. Sorry about the towels.

Hope you enjoy. I look forward to hearing your feedback and suggestions as I make progress.
 

Attachments

  • Tank frame.jpg
    Tank frame.jpg
    70.9 KB · Views: 11
  • Fish room.jpg
    Fish room.jpg
    82.2 KB · Views: 11
  • Opening stairwell.jpg
    Opening stairwell.jpg
    68.3 KB · Views: 11
  • Fireplace and tv area.jpg
    Fireplace and tv area.jpg
    81.2 KB · Views: 12
It looks like you're off to a good start. We like pics around here so you get kudos for that. Have fun with your build.
 
Thought I would update after 10 days. A lot was done with finishing the electrical, plumbing and HVAC for rough inspection. Insulation was also put in. Drywall will be complete by Monday. Then the stairs, trim, paint and flooring. Glass has been ordered for the tank. Everything so far has been ahead of schedule so I am very pleased with the progress.

Here are some pictures to update...
 

Attachments

  • fish tank front.jpg
    fish tank front.jpg
    34.6 KB · Views: 12
More pictures. Finally figuring out how to load the pictures. Life is better now.
 

Attachments

  • Plumbing for fish room RC.jpg
    Plumbing for fish room RC.jpg
    25.1 KB · Views: 9
  • Fireplace and tv area RC.jpg
    Fireplace and tv area RC.jpg
    21.7 KB · Views: 13
  • fish tank front RC.jpg
    fish tank front RC.jpg
    23.7 KB · Views: 11
  • Change to stairs RC.jpg
    Change to stairs RC.jpg
    21.8 KB · Views: 11
I am trying the photobucket out to make the pictures a little more friendly.

Here is the front of the tank view progress
http://s
1133.photobucket.com/albums/m582/TChristman37/?action=view&current=fishtankfrontRC.jpg
 
Trying to make the picture format a little more friendly.

fishtankfrontRC.jpg
[/IMG]

FireplaceandtvareaRC.jpg


ChangetostairsRC.jpg
[/IMG]

Plumbingforfishroom.jpg
[/IMG]

Today was priming and bathroom tile was set.

Tomorrow is trim work and door installation.

Very happy with the progress through 15 days.

Some equipment was ordered today. Two sea-swirls for the returns. I have used sea swirls on every tank and really like the random oscillating returns. I have used them on my last two tanks but this one will use two.

Tank building will start a week from Wednesday. Getting more excited by the day.
 
Last edited:
Just an update on the progress from today. Almost all of the trim work was completed as well as the doors hung. Some more drywall touch up was done today. Tomorrow is priming the doors and finishing the touched up drywall as well as the stairs. Painting starts Friday.




fishroomprimed-1.jpg
[/IMG]

Picture inside the fish room


Primedtankareawithcrown.jpg
[/IMG]


Primed front of the fish room with the crown

viewfromfishroom.jpg
[/IMG]

From inside the fish room

Saunaandbathroom.jpg
[/IMG]

Workout room, door to left to sauna, door to right to bathroom

Getting close.
 
Last edited:
Man that is sweet. Every mans dream fish tank room, workout room and a sauna room too! Nice work. Keep up the great work. Looking forward to see it all done!! More pics please!!
 
Thanks Steve. The stairs did not get done all the way today but here are some before and after pictures of the progress that was made.


IMG_6335.jpg
[/IMG]

IMG_6338.jpg
[/IMG]

IMG_6336.jpg
[/IMG]

IMG_6339.jpg
[/IMG]
 
Wow looks great. You must be a trim carpenter!!! Stairs looks really nice! You are doing some really nice work. Not easy at all Taking a unfinished basement and turing it into that.
 
The stairs were done by a professional from my local reef club. I know my limitations for sure. He builds large staircases and does custom woodworking for a living. I wish I could take the credit but I can not.
 
Thank you. Here are some updates from the weekend. Today the acid staining is happening and tomorrow will be the sealer. On the home stretch for sure.

IMG_6342.jpg
[/IMG]

Fireplace and tv area

IMG_6344.jpg
[/IMG]

Stairwell

IMG_6345.jpg
[/IMG]

View up the stairs....Stairs still not finished

IMG_6346.jpg
[/IMG]

View across the room. A little dark

IMG_6347.jpg
[/IMG]

View down the stairs.

Tank construction will begin on Wednesday. Everything coming along well.
 
Wow looks stunning. Great job. Will the saltwater not mess up the stained concrete floor?? Great choose for the floor if saltwater wont mess the clear coat up. Looks great keep up the hard work and keep us updated with photos.
 
According to the manufacturer it should not have any impact at all on the acid in the concrete. It will be sealed tomorrow but they said they use their products all the time with beach restaurants and beach retail locations all the time without sealing it.
 
What was a very fast moving project slowed down a little this week. The sealer for the acid stain was not up to snuff and it has delayed the completion of the project. The electrical, hvac and plumbing has all been completed. I am very happy with the color of the stain just not the sealer. The stand was also completed yesterday. Glass was delayed until Friday. Here are some updated photos.


IMG_6353-1.jpg
[/IMG]

The sink for the fish room

IMG_6354-1.jpg
[/IMG]

The stand

IMG_6359.jpg
[/IMG]

View across family area to the front of the tank

IMG_6360.jpg
[/IMG]

Different view

IMG_6361.jpg
[/IMG]

Bathroom...almost complete.

Should have some tank construction pictures up tomorrow. I hope.
 
are you building the tank on site, or having it built on site, or is the tank pre-made/made to your order and shipped/delivered?
just curious.
This is very cooL!!!
 
Back
Top