6000s

CrystalAZ

New member
Hi there.

I am planning on the new 7095 controller and 2 6000s... but obviously I can't get the controller yet. If I just got the streams now, would I be able to use them without a controller? Could I still adjust the flow rate, or do you need the controller to do that?

Thanks! :)

Crystal
 
Crystal, I have a 6100 you can borrow if you'd like to test it. You'll have to turn it down quite a but, but at 50% it'll be like the 6000. You can borrow it for a few weeks, until about mid-September.
 
Crystal, if this is for a 120 your plan would work fine. That is actually exactly what I would recommend. Just keep in mind the 6100 and lowest power is equal to the 6000 and highest power so you will be able to turn down the 6000 much lower if needed.
 
Back
Top