i wanted to let all of the people who are going to get some of this pipe know where im at.as of now i have all the base plates cut the top plates are rough cut and need to be routered and drilled for bolts(when we assemble them).i stayed after work for an hour today to do some the machining to the flange rings.i still need to groove the flange rings for an o-ring gasket.i should get this done by friday(i need to go get some gaskets before i cut the groove).here are a few pics to show you what the parts look like.
this weekend is my birthday so i doubt we could build them this weekend but maybe we can plan to get together the following weekend and build these suckers.
here are the parts
this pic shows the flange ring on the pipe