xroads
New member
I have a 75 that I need to get up & running so I can move. I want to drill 2 holes in the bottom for drains & 2 in the back for return. My thought was to pvc pipes straight up for the over flows. Is this right & where is best place to get bulk heads. Does anyone use rigid PVC for everything or do you use hose?
Thx
Craig
Thx
Craig