DaveBrader
Registered Member
I want to Tee off of my main return from the sump to feed my new Chiller. My return from my sump is 1" PVC. If I Tee off of that main line, and reduce to 1/2 PVC to the chiller, how can I figure the amount of flow that will run thru the TEE to the chiller thru the 1/2 " PVC?
Thanks so much
Dave
Thanks so much
Dave