yes, I have a 10G QT set up waiting. From what I can tell there won't be territory issues betweeen these two, but just wondered if one needed get settled in first. In the DT, I have 55lb lr and loads of live sand for the Goby. I read the article on here about the Yasha and making a PVC tunnel in the sand which sounds like a good idea.