So I have a tank I am in the process of setting up.
7ft x 2ft x 2ft.
It has four drilled holes in the bottom that accept a 3/4" bulkhead.
I am building an overflow in the back and drilling more holes for it.
The return pump for the overflow is a Mag24 approx 1600gph.
How do I setup the closed loop? use all four holes on the bottom as returns and drill two more holes for feeding the pumps? Or use two of the holes existing as feed and two as return? If I drill more holes should they be in the bottom or the back? I planned on using two external pumps to run the CL and dont want to use any powerheads in thew tank.
Any advice is appreciated as I have never used a CL system. Thanks!
<a href="http://s448.photobucket.com/albums/qq210/jusbechillin/?action=view¤t=2022.jpg" target="_blank"><img src="http://i448.photobucket.com/albums/qq210/jusbechillin/2022.jpg" border="0" alt="Tank"></a>
7ft x 2ft x 2ft.
It has four drilled holes in the bottom that accept a 3/4" bulkhead.
I am building an overflow in the back and drilling more holes for it.
The return pump for the overflow is a Mag24 approx 1600gph.
How do I setup the closed loop? use all four holes on the bottom as returns and drill two more holes for feeding the pumps? Or use two of the holes existing as feed and two as return? If I drill more holes should they be in the bottom or the back? I planned on using two external pumps to run the CL and dont want to use any powerheads in thew tank.
Any advice is appreciated as I have never used a CL system. Thanks!
<a href="http://s448.photobucket.com/albums/qq210/jusbechillin/?action=view¤t=2022.jpg" target="_blank"><img src="http://i448.photobucket.com/albums/qq210/jusbechillin/2022.jpg" border="0" alt="Tank"></a>