I have two 6095's being controlled by my apex. They are plugged into my eb8. Do they need to be plugged into the eb8 in order to controlled or can I plug them into another power source?
I have never used an Apex, I am not familiar with the components. The 6095's will need to be powered by the power source that is included with the 6095 and the control is done by plugging into the DIN port at the top of the 7090 controller and setting it to external mode.
I have two 6095's being controlled by my apex. They are plugged into my eb8. Do they need to be plugged into the eb8 in order to controlled or can I plug them into another power source?
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.