Green_Lionfish
New member
I am setting up a 180g. My drain hole and sump holes have 3" holes. I was planning to use the heavy duty bulkhead (schedule 80). After further research (according to bulkreefsupply website), a regular 2" bulkhead has 2.83" installation hole. For 2" schedule 80 bulkhead has 3.18" installation hole.
The 1.5" schedule 80 has 2.51" installation hole. Is this too small and might be leaking as it's basically .25" gap around the hole? Should I just go with the 2" regular bulkhead?
Thanks in advance.

The 1.5" schedule 80 has 2.51" installation hole. Is this too small and might be leaking as it's basically .25" gap around the hole? Should I just go with the 2" regular bulkhead?
Thanks in advance.