Help Drilling my tank, ASAP

DJM28064212

New member
I know I ran late getting everything together, but I really need to get my tanks drilled as soon as possible. I will get my bulkheads in on Monday, when UPS gets here, if my package from PA is on time. If anyone is available to help me drill two tanks that day it would really be a huge favor. if not Monday I am free Tuesday and Wednesday before 4pm. If it can't be done by then, I am free all day on thursday.

Thank You, Doug
 
bring them by my place and we can drill there. you'll need the overflow box anyway to know where to put the hole. how much flow are you going to put through the overflow?
 
well i got a 1.5 in bulkhead for that and i have that genx so with head loss and the 2 outlets i think it came to about 800 gph.
Doug
 
ok, so you do need the full size one. i was thinking about making you a smaller one.

i have some spare bulkheads, so no need to wait for UPS. gimme a call if you want to try anything this weekend. 540 921 7601.
 
Back
Top