I am about to set up my 120 and am using a jebao dv9000. I use an apex to control my tank and can run the jebao with the apex and control cable, but I am think Ingrid I won't go that way. I think I am going to run it seprately using an outlet on an eb4. So my question is if the outlet turns off for a feed cycle will the pump just come back on to the prior setting when power is restored?