<a href=showthread.php?s=&postid=11468154#post11468154 target=_blank>Originally posted</a> by RBU1
Here is what $800.00 worth of Schedule 80 plumbing looks like.
<a href=showthread.php?s=&postid=11468468#post11468468 target=_blank>Originally posted</a> by mrcrab
Doesn't look like much at all, does it? :lol:
<a href=showthread.php?s=&postid=11470039#post11470039 target=_blank>Originally posted</a> by RBU1
KenT. AFY was double the price. In my opinion they are way overpriced.