Hi.
First time posting here.
I'm looking for some advice on my overflow set up before I drill holes.
I'm setting it up as a ghost overflow style weir and BeAnAnimal drains.
Mainly I'm wondering if these holes are low enough and if I have enough holes connecting the inside box to the outside box.
I am probably going to spread the connecting holes further apart, most likely evenly spaced along the box, I didn't think of doing this until after I finished the drawing.
Also, the hight of the wier in relation to the holes and the top of the tank, is 25mm from the bottom of the euro brace enough or too much? the euro brace will be 20mm thick.
One other thing, teeth or no teeth on the wier?
Anything else I have overlooked?
First time posting here.
I'm looking for some advice on my overflow set up before I drill holes.
I'm setting it up as a ghost overflow style weir and BeAnAnimal drains.
Mainly I'm wondering if these holes are low enough and if I have enough holes connecting the inside box to the outside box.
I am probably going to spread the connecting holes further apart, most likely evenly spaced along the box, I didn't think of doing this until after I finished the drawing.
Also, the hight of the wier in relation to the holes and the top of the tank, is 25mm from the bottom of the euro brace enough or too much? the euro brace will be 20mm thick.
One other thing, teeth or no teeth on the wier?
Anything else I have overlooked?