Non-Controllable TUNZEs on SEIO controller

derek4real

New member
I was wondering, is it possible to put the 6025, 6045, 6065, 6085, or 6125, on a SEIO controller without voiding the warranty of TUNZE Pump.

The other alternative, if they SEIO controller option does not work, would be to run them on and off at 30 min intervals via ACJr.

Thanks,
Derek
 
It would definitely void the warranty, Hz modulation controllers are not one size fits all they have to be custom tuned to the pump as they can damage the motor coils and cause the pumps to run hotter if they are not, they have to carefully vary the voltage and Hz to achieve the desired result.
 
Thanks for the "quick reply"

If I went with the alternative, what is the suggested time before turning on/off non-controllable TUNZEs? I have heard at least 15 minutes off before turning back on.
 
Back
Top