Kalen
New member
A few weeks ago I bought a 125 Lee Mar tank with center overflow. The tank has been sitting for the last few weeks as I'm waiting on my steel stand to be delivered. When I bought it the lfs told me to drill into the overflow box to plumb the return line. Now I'm
Getting closer and closer to actually plumbing it. I'm really hesitant on the advice my lfs told me and recommend that I do. I brought the problem and dementia I'm currently facing and he agreed that it was not a smart choice to drill into the over flow box do to the simple fact what happens when the power goes out and the pumps are of. That's a lot of water to back siphon into a 40 breeder sump. After racking my brain all day I have decided to ask the question and see what responses I get from the pictures I've included of the box. I know I don't want to plumb above the over flow box so now I'm faced with where to put the return nozzles since I know I need to modify the overflow box at the teeth.
Thoughts, comments, suggestions


Getting closer and closer to actually plumbing it. I'm really hesitant on the advice my lfs told me and recommend that I do. I brought the problem and dementia I'm currently facing and he agreed that it was not a smart choice to drill into the over flow box do to the simple fact what happens when the power goes out and the pumps are of. That's a lot of water to back siphon into a 40 breeder sump. After racking my brain all day I have decided to ask the question and see what responses I get from the pictures I've included of the box. I know I don't want to plumb above the over flow box so now I'm faced with where to put the return nozzles since I know I need to modify the overflow box at the teeth.
Thoughts, comments, suggestions

