maroun.c
New member
Hi would like to know if your 220 V version will work directly on controlling 220V equipment with your regular powerbars or do I need 220V replacement and do you offer those so I can buy a complete package directly. if not please link to suppliers.
Also advice on which controller in your line to go for for the following:
Lights controls:
-3 MH separate control or at least 2 in one plug and a third alone.
-1 controls for T5
-1 control for Actinics
-1 control for moolights
Can keep some of the lighting on separate timers however would need the controller to shut off 2 halides then the third if temp keeps climbing (like in a chiller failure)
-Chiller
-Heater
-PH probe, ORP, Temp (do these come standard with the cotroller or should I order them separate)
-Record reading in graphs or any other presentation on PC
-controller should maintain its setup during power failures as my backup genearator needs 45 secs to kick in (or do I need a UPS?)
-notification by email or SMS in case any reading is off more/less than a certain limit.
not critical requirements:
-dosing pumps x3
-remote logging in via PC and modifying things while I'm on travel.
-Fans can keep them on separate timers but would be great to have them kick in at a certain temp in the canopy.
If possible state all additional items needed for above controls so I don't miss a thing as I'm shipping accross the globe with long shipping time and close to 100% additinal charge for shipping, customs and tax on customs :mad2:
Thanks for your help
Also advice on which controller in your line to go for for the following:
Lights controls:
-3 MH separate control or at least 2 in one plug and a third alone.
-1 controls for T5
-1 control for Actinics
-1 control for moolights
Can keep some of the lighting on separate timers however would need the controller to shut off 2 halides then the third if temp keeps climbing (like in a chiller failure)
-Chiller
-Heater
-PH probe, ORP, Temp (do these come standard with the cotroller or should I order them separate)
-Record reading in graphs or any other presentation on PC
-controller should maintain its setup during power failures as my backup genearator needs 45 secs to kick in (or do I need a UPS?)
-notification by email or SMS in case any reading is off more/less than a certain limit.
not critical requirements:
-dosing pumps x3
-remote logging in via PC and modifying things while I'm on travel.
-Fans can keep them on separate timers but would be great to have them kick in at a certain temp in the canopy.
If possible state all additional items needed for above controls so I don't miss a thing as I'm shipping accross the globe with long shipping time and close to 100% additinal charge for shipping, customs and tax on customs :mad2:
Thanks for your help