I am going to get the Fluval SP6 which will feed 4 tanks. The SP6 calls for 1.25" pipe but I want it to go to 1" since the tanks are already drilled for 1" bulkheads. I am going to go from the pump, up to a 1.25" tee and then split into two different sides of the rack that will be 1" pipes that lead to the tanks.
Would I use reducing bushings or reducing couplings when going from the 1.25" tee to the 1" pipes? Which is better and why?
These are examples of what I'm referring to:
Reducing Coupling
Reducing Bushing
Would I use reducing bushings or reducing couplings when going from the 1.25" tee to the 1" pipes? Which is better and why?
These are examples of what I'm referring to:
Reducing Coupling
Reducing Bushing