I am starting to pick out the parts needed to plumb my system and am at the closed loop section.
My plan is the follows:
(2) 1.5" drains feeding into mag 18 (existing pump, may change to reeflow dart). The 4 (or more) returns will be over the top.
Here are the choices
#1
5 Ports - 3/4" x 2"
#2
4 Ports - 1" x 2"
#3
4 Ports - 3/4" x 2"
#4
6 Ports - 1/2" x 2"
#5
6 Ports - 1" x 2"
What would you use?
My return from the sump will be using the existing drains in the 180 and using an iwaki 55rxlt and 2 penductors
My plan is the follows:
(2) 1.5" drains feeding into mag 18 (existing pump, may change to reeflow dart). The 4 (or more) returns will be over the top.
Here are the choices
#1
5 Ports - 3/4" x 2"
#2
4 Ports - 1" x 2"
#3
4 Ports - 3/4" x 2"
#4
6 Ports - 1/2" x 2"
#5
6 Ports - 1" x 2"
What would you use?
My return from the sump will be using the existing drains in the 180 and using an iwaki 55rxlt and 2 penductors