shyland83
New member
I'm drilling my 120 tommorow afternoon and i cannot decide if i'm going to drill for a closed loop. I'm going to add 4 bulkheads for the horizontal overflow about 9 inches apart. If i drill for the closed loop the plumbing is going to be really tight and i'm gonna have a hard time sueezing the ball valves and pump under the stand. hard to describe the problem, but i just can't decide if it's worth it. anyone with a 120 out there have or not have a closed loop and have any feedback? If i don't do the closed loop i will probably throw a couple old MJ's in for now with so Hydor flo's until i can afford some tunze's. thanks for any opinions, sometimes i just can't think for myself.