mr&mrsfish
New member
Roger,
I have two 6105s on opposite ends of my aquarium. These are controlled with an Apex. I currently have a program that cycles one on at 100% while the other is off (0%) for a period of 30 seconds (not ramp just simple on/off operation) and then vice versa. Can this be done with the 7096 or 7095? Everything I've read suggests Tunze controllers still limit the minimum output to 30%. Is on/off operation possible yet? I'm wanting to switch from Apex controlled to Tunze controlled but can't if the 30% limitation is still in place.
Thanks.
I have two 6105s on opposite ends of my aquarium. These are controlled with an Apex. I currently have a program that cycles one on at 100% while the other is off (0%) for a period of 30 seconds (not ramp just simple on/off operation) and then vice versa. Can this be done with the 7096 or 7095? Everything I've read suggests Tunze controllers still limit the minimum output to 30%. Is on/off operation possible yet? I'm wanting to switch from Apex controlled to Tunze controlled but can't if the 30% limitation is still in place.
Thanks.