90reefernyc
Member
I am trying to install two tunze 6105 on to my profilux.
I have the tunze 1 & 2 cables and the splitter. First I hooked up my cable to the L3,4 port then I put the splitter then I connected the tunze cables to that.In 1-10 interface I labeled the pumps L3 current pump 1 and L4 current pump 2 I put my settings as both pumps in group 1for some reason one pump responds the other just stays on full no matter what I do???HELP
I have the tunze 1 & 2 cables and the splitter. First I hooked up my cable to the L3,4 port then I put the splitter then I connected the tunze cables to that.In 1-10 interface I labeled the pumps L3 current pump 1 and L4 current pump 2 I put my settings as both pumps in group 1for some reason one pump responds the other just stays on full no matter what I do???HELP