Turbelle Controller 7095 supply

joelsaxton

Premium Member
I ordered one from Champion Lighting a couple weeks ago, but I was recently told they are only receiving about 1 per week and there are "several dozen" backorders. So unless Tunze is ramping up production, I would not expect to get mine until this summer at the earliest.

Is the 7095 coming out in a steady stream or is Tunze looking to increase production? If not, what about their other controllers? I currently have an orphaned Turbelle 6100 that I ordered at the same time as the 7095. I'd like to run it as soon as possible.
 
The factory was closed for 2 weeks so they just reopened and I should get more soon. Production will increase as better and faster assembly techniques are developed in time.

The 6100 does work without a controller so their is no reason to not use it. The 7091 is available, I have some more coming in next week, but I would just wait, I don't think it will take more than 4-6 more weeks.
 