mfinn
Active member
I would really like to try a L1 pump when they come out, but I see the output is 1".
My closed loop plumbing is all 1-1/2".
The return plumbing goes to a 1-1/2" header across the back of the tank, with 1" risers going to the bulkheads on the back of my tank.
I can make the pvc tie in to the header using reducers going from the pump's
1" output to the 1-1/2" header near the pump's location inside the stand, but my question is, what would that do to the rated flow?
Also kind of curious with all the pvc I have, how much of the 3100 gph I would loose to head pressure?

My closed loop plumbing is all 1-1/2".
The return plumbing goes to a 1-1/2" header across the back of the tank, with 1" risers going to the bulkheads on the back of my tank.
I can make the pvc tie in to the header using reducers going from the pump's
1" output to the 1-1/2" header near the pump's location inside the stand, but my question is, what would that do to the rated flow?
Also kind of curious with all the pvc I have, how much of the 3100 gph I would loose to head pressure?
