Yesterday I moved some of the walls in the sump to work better for me and I built a filter sock holder( I bought the sump used). Tonight I got the sump in place and finished the plumbing for the drains. It's all coming together, slow but sure!! I'll try to upload some pics, sorry i'm still not great at it...
My sump is not going to have a fuge in it. I'm thinking of doing a remote fuge
One question I do have is... In the sump, does it matter what chamber the skimmer goes in? I'm thinking I'd like it to go -Drains to 2- 7" filter socks/ Reactor chamber (all reactors will be fed bye a manifold from the return pump. They will be just sitting in the sump)/ Skimmer/ Bubble trap/ Return pump.