I'm running dual-Hammerheads which push 5800gph each... It's more than enough power!is the hammer head going to push enough water to exit through all those holes on the front of the tanks and the sides/back? i havent used one, so i dont know what kind of flow a hammerhead pushes but that seems like a lot of holes to be distributing water.....
Both CL pumps are completely plumbed in at this point, as is the Chiller... Tomorrow I'll plumb in the drains and the primary drain line which leads to the sump. As soon as the drains are in, I can begin a leak test.![]()
-Tim
![]()
![]()
![]()
![]()
Are they going to be on a timer for "resting time"
Nope, it wouldn't be possible due to the location of the tank... Besides, I like 20k's!Did you ever consider using Solar Tubes to light that monster of a tank?
You missed it because a 15-20k Generac is definately in the plans, but not a #1 priority at the moment since I already have a large portable generator.Wow...just read this build from front to back, and the one this I see missing......generator backup. Unless your on a very very stable grid, it's a must have for a tank this large. got one in the plans?
Scott
I just began filling it for the leak test...
-Tim
oh, and do you plan on using a DSB or shallow?
(approx how much sand do you think you will need?)