So this build should have been called something like "The Longest Build Ever." Working 50-60 hours per week while pursuing my civil engineering degree at 9 credit hours per semester doesn't leave much time for anything else, including sleep. This is the first summer in 5 years that I don't have to take any classes! Since I only have work to deal with, I have time for the tank.
It's not much but I got the 3/4 birch plywood top cut and countersunk the stainless steel bolts. I notched out the bottom and even bought a new router for the job. The Epifanes marine spar varnish arrived also. Next up, 7 coats of varnish for both the top and bottom sheets of plywood. I'm still debating if I should stain the bottom or not.