AgentSPS
New member
For the sand, I decided to put a base layer of live sand with a 2" layer of #3 pink sand. Figured it was necessary with all the flow from the 2 Vortechs.
Put down egg crate first to hold the live sand in place and prevent the rockwork from possibly cracking the glass below.
Now the live sand:
Hands were too wet and dirty to take the final photo of all the bottom layer of the live sand smoothed into the squares of the eggcrate but you get the idea...
Put down egg crate first to hold the live sand in place and prevent the rockwork from possibly cracking the glass below.
Now the live sand:
Hands were too wet and dirty to take the final photo of all the bottom layer of the live sand smoothed into the squares of the eggcrate but you get the idea...