pacificdiver
New member
I've decided to add a mixing station to my basement sump room. I've never built a mixing station before, so I'm hoping someone can take a look at this design, and note any problems or changes I should make. I'd hate to get this thing built, only to realize I could have made some changes to simplify or improve things. I was planning on using 1.25" PVC.
(I've omitted a few things, such as the RO line to the auto-topoff reservoir, and the outflow from the system, which drives old water out for water changes)
The red/black parts are 1.25" CEPEX valves
The yellow parts are unions
Thanks in advance for your help...
NOTE: the DPC is the "divorce protection container" and will take a 3/8" line from the RO reservoir. There will be a float valve with a backup solenoid, but in case of dual failure, the line will drain to an empty 32G trash can with a flood sensor linked to Apex.
FRONT VIEW
CLOSEUP VIEW
<a href="https://ibb.co/b6G34GN"><img src="https://i.ibb.co/TwNTQNP/system-design-CLOSEUP.png" alt="system-design-CLOSEUP" border="0"></a>
(I've omitted a few things, such as the RO line to the auto-topoff reservoir, and the outflow from the system, which drives old water out for water changes)
The red/black parts are 1.25" CEPEX valves
The yellow parts are unions
Thanks in advance for your help...
NOTE: the DPC is the "divorce protection container" and will take a 3/8" line from the RO reservoir. There will be a float valve with a backup solenoid, but in case of dual failure, the line will drain to an empty 32G trash can with a flood sensor linked to Apex.
FRONT VIEW

CLOSEUP VIEW
<a href="https://ibb.co/b6G34GN"><img src="https://i.ibb.co/TwNTQNP/system-design-CLOSEUP.png" alt="system-design-CLOSEUP" border="0"></a>