I have a very basic question regarding the functionality of the Apex system.
I would like to run the Apex as a controller for the ATO. Is there a way I can plug float switches directly into the Apex or do i need an additional piece of hardware (breakout box etc)
Ideally, I would have a float switch in the reservoir, and then two in the sump. Do i need additional hardware?
Which float switches are Apex-controllable?
Thanks in advance!
I would like to run the Apex as a controller for the ATO. Is there a way I can plug float switches directly into the Apex or do i need an additional piece of hardware (breakout box etc)
Ideally, I would have a float switch in the reservoir, and then two in the sump. Do i need additional hardware?
Which float switches are Apex-controllable?
Thanks in advance!