Got some major progress done today.
Here is a picture of both drains (white with red handles) the far one goes to the skimmer and sump and the close one goes to the fuge. You can also see the input to the CL going down to the pump and up to the OM Squirt.
Here is a better picture of the drain to the fuge. The pipe coming from behing the CL pump is the skimmer/sump drain.
Here is a close up of the OM. I couldn't finish the rest of the inputs from the OM to the tank. Ran out of 3/4" pvc and 3/4" 90 degrees.
Here is one of the two inputs from the CL the I got done.
Each of the inputs (except the one from the CL that enters on the lower back) will enter at a 45 degree. I am going to replace the white PVC with clear during the final set up.
So I hopefully will have test water in the tank tomorrow. I may shoot some video of the OM working.
It sure is nice to finally made some progress on this tank.
Thanks for all the help so far guys,
Keith
PS If you haven't listen to the Podcast's on ReefCast.com you should soon. (Plug, Plug)