Am considering the Apex DOS as a automated water change pump. Anyone been doing this for a while (recognizing that it's not that long in the market)? I'm thinking about using one head to add NSW and the other to remove OSW. Do they stay in synch? Do differential levels affect dosing rate? Do you need the same length of tubing on both dosing heads? Etc, etc.