<a href=showthread.php?s=&postid=14533797#post14533797 target=_blank>Originally posted</a> by Stray32
I am not really worried about them spreading, I will just frag them at that point. I will have 8 different zoas arriving on Friday, all on plugs or disks I would imagine, and I am trying to figure out an alternative to attaching the plugs/disks directly to my rockwork, ie by cutting the frag from the plug. Just wondering if any of you guys had tried this before. Not sure how easily loose zoas are to attach to rock.