leveldrummer
New member
Im running two 6105s through a 7096, I have it set on sequential with power alternating between 30 and 50% on each side.
The pumps run at 50%, then 30%, then off for a few seconds. How do I set this up so the pumps run randomly at various % without shutting off for a few seconds between? Is sequential the best program to use for this?
The pumps run at 50%, then 30%, then off for a few seconds. How do I set this up so the pumps run randomly at various % without shutting off for a few seconds between? Is sequential the best program to use for this?