Zacktosterone
Active member
Just a basic manifold.
Installed a 1 1/2" x 1" tee on the return line. Manifold itself is 1" with a ball valve for isolation and a union for maintenance. Used 1" x 3/4" tee with ball valve for future refugium or frag tank and 1" x 1/2" tees for the reactors with ball valves for flow control and 1/2" John Guest style fittings. 1/2" OD polly tubing to the reactors then manifolded the returns from reactors with isolation valves on each as well.
Excuse the wiring mess, just moved my Apex over from other tank and still getting everything hooked up and organized.
[/URL][/IMG]![]()
[/URL][/IMG]![]()
Nicely done!!! Very clean