zero26 MoneyPit Maestro May 28, 2011 #1 I need to install a longer USB cable from the apex to the eb8. Should I just pull out the existing USB cable and let the fallback settings take?
I need to install a longer USB cable from the apex to the eb8. Should I just pull out the existing USB cable and let the fallback settings take?
R RussM Active member May 28, 2011 #2 Sounds like a good opportunity to test your fallback programming. Go for it.