I've also found those T's at BRS, but the problem is that I need 1/2" out of my pump and 1/2" into my reactor. 3/8" still requires 2 - 3/8" to 1/2" adapters which I still have not found. This is when I just chose to throw a couple pieces of tubing into each other and called it a day. I would love it if someone finds the exact T that would not require adaption!
I know its been a while on this forum, but just in case some one was still loking for the right adaptor, a Tee for the inlet of the reactor, 1/2 inch on 2 sides with a quarter on the tee stem....
So after all the research I found you could use a 1/2 inch TEE, that is 1/2" all 3 sides, but then you could use a proper adaptor for 1/2 inch to 1/4 push in.... Ill post the link and the name of the exact stuff, just in case the link is deleted.
Legris 3166 56 62 Nylon Push-to-Connect Fitting, Inline Reducer, 1/4" x 1/2" Tube OD
heres the link from amazon:
http://www.amazon.com/dp/B009PTDI6K/ref=pe_385040_30332190_TE_M3T1_ST1_dp_1
this is going to be a perfect things.
Yes do not forget to puct in a check valve on that 1/4 lin ebefore it enters the tee!!
Awais
Hey Awais,
Thanks for the tip on that connector. I just ordered one for my setup.
I'm lost with the reducer...doh! Where is this placed?

I finally made it through both forums. Started making the first half of my own reactor tonight. I'm using two stages from an old RO vs BRS style reactors which have larger inlet and outlet sizes.
Here's a pic of it ready to screw together.
This first reactor stage has three different sized pipes that the water has to flow through and hopefully provide sufficient amount of dwell time and mixing. Inlet at the top as normal, flows down and into the holes at the bottom of the outter-most pipe, back up and into holes at the top of the middle pipe, back down to enter into the bottom of the inner most pipe and then back up and out of the reactor.
This will of course feed the second chamber with the floss and GAC, and then directly into the skimmer.
View attachment 265171
Pressure tested tonight and it's solid! I was pleased at how well everything fit together. Let me know if interested and I'll provide a detailed parts list.
Terri, did you ever get your system stable? And are you still using the LaCl?
I finally made it through both forums. Started making the first half of my own reactor tonight. I'm using two stages from an old RO vs BRS style reactors which have larger inlet and outlet sizes.
Here's a pic of it ready to screw together.
This first reactor stage has three different sized pipes that the water has to flow through and hopefully provide sufficient amount of dwell time and mixing. Inlet at the top as normal, flows down and into the holes at the bottom of the outter-most pipe, back up and into holes at the top of the middle pipe, back down to enter into the bottom of the inner most pipe and then back up and out of the reactor.
This will of course feed the second chamber with the floss and GAC, and then directly into the skimmer.
View attachment 265171
Pressure tested tonight and it's solid! I was pleased at how well everything fit together. Let me know if interested and I'll provide a detailed parts list.
Terri, did you ever get your system stable? And are you still using the LaCl?
There you are. How are things going?







Terri, when I was reading the last bit of the forums last night and read about the health problems you've been dealing with, my heart went out to you, girl! I read my wife your post, and we prayed for you then and there. I will continue to pray for you... and I feel confident that this is going to be Okay! I serve an awesome and very capable God who loves you dearly. So Hang in there!!
Let me know if you have any problems with clogging of the line. It would sure help me if mine wouldn't. With the T push-connect, I have the LaCl solution going down into the center hole, with the tank water coming in from one end and exiting out the other. I can't figure out why it clogs right there as water pressure/flow should keep that clear:blown: