LarryW
Premium Member
ok, so the sump is under the stand, the counter top is together, and my 55g barrel is in it's final resting place. I have changed the drain pipes out for 2 footers. You can see that my fuge is going to be huge. I still need to cut the hole in the counter for the sink, thats this weekend's project. I also need to put in a new kick plate under the cabinets. When I installed the base cabinets, I neglected to remove the base molding. Well, that cause the counter to be off the wall by 3/4 of an inch. So I had to pull them out, cut the base off, and reinstall the cabinets. that forced me to cut the toekick, as it wouldn't just rip off...
Last edited: