The plumbing is done with 80% glued and the rest dry fit. I tried to minimize the umber of unions while still being able to disassemble things if need be. The placement of the valves and unions might look a little strange but I had some clearance issues to the drain/return bulkheads that I had to work around.
I'll be ready for a water test after the electric goes in Tuesday. I decided to get a pro in to knock that out. They'll also be puting in some room lighting so I'll be able to get some better pictures.
Return pump and manifold
The returns - ill make some adjustments here once I get some sort of bubble minimized designed.
Left side drain/returns under the tank.
-Mike